Business Analysis, Project Management and Validation Delivery Services Location: Inchinnan, Glasgow, Scotland Project Industry: Pharmaceutical

This Large Volume Liquid (LVL) manufacturing project involved an expansion to an existing operational facility. The works included the construction of a state-of-the-art LVL Manufacturing Facility, Raw Materials Warehouse, and interconnecting link corridors between existing and new buildings.

Breakdown of Works
– Installation of 2 × 10,000-litre glass line vessels to support manufacture of corrosive and standard buffers.
– Installation of 1 × 5,000-litre stainless steel vessel to support manufacture of alcohol and standard buffers.
– Future capacity vessel rooms designed to accommodate an additional 2 × 10,000-litre vessels depending on usage profile.
– Water for Injection (WFI) system upgrade.
– New mechanical and electrical services, including effluent treatment plant.
– Installation of new chilled water and compressed air systems.
– Installation of major equipment including aseptic filling machines, weighing and dispense booths, – pharmaceutical-grade washers, and autoclaves.
– Enabling works such as new access road and diversion of underground utilities.

Our Role / Scope
Acting on behalf of the client, our team provided comprehensive Business Analysis, Project Management and Validation Delivery services.

Business Analysis:
– Conducted in-depth evaluation of existing business processes across multiple workstreams.
– Delivered Gap Analysis, Operational and Process Flow mapping.
– Defined business and process needs to inform design and build stages.
– Identified opportunities for operational improvement to optimise efficiency.

Project Management:
– Oversaw implementation and construction activities through testing, commissioning, and handover.
– Acted as primary liaison between client and principal contractor.
– Provided consistent updates and coordination across all workstreams to ensure project delivery on time and within scope.

Validation delivery:
– Provided support for validation lifecycle documentation creation.
– Oversaw IQ,OQ and PQ qualifications on all manufacturing and process equipment.
– Delivered FMEA workshops on all process and equipment operations.

Project Team
– Project Director
– Business Analyst
– Project Manager
– Project Engineer

Project Impact
Through proactive business analysis, meticulous project management, and seamless coordination between stakeholders, EPS played a key role in delivering a complex pharmaceutical manufacturing facility expansion on time, within budget, and to the highest quality standards.

Contact

Let's Work Together.

Let’s find out how to work together and create something meaningful and valuable.

Geddes House
Kirkton North
Livingston
EH54 6GU

Developed by Apollo Internet Media